For operators in the maritime sector, Shore Facility Operation Permit processes are the cornerstone of operational continuity. The “Regulation on Shore Facility Operation Permits and Shore Facility Operators” (the “Regulation”), published in the Official Gazette dated 18.11.2022 and numbered 32017, defines the principles for berthing and unberthing of vessels (including those not qualifying as ships), mooring, loading/unloading (stevedoring), and the procedures for passenger embarkation/disembarkation, as well as the service standards for shore facility operators. The most recent amendment to the Regulation was made on March 14, 2025.
Application Process for Shore Facility Operation Permit
Under the Regulation, applications for initial permits, renewals, and amendments have been digitalized. All applications are processed through the e-Government (e-Devlet) portal. The required documents are listed in the annex of the Regulation. Applications are submitted to the Ministry of Transport and Infrastructure, General Directorate of Shipyards and Coastal Structures (the “Administration”).
- Operation Permit Duration: Issued for a maximum period of 5 years by the Administration.
- Application: The operator applies to the Administration with the necessary documents based on the scope of activity.
- Renewal and Amendment: Operators must apply to the Administration at least 2 months prior to the expiry of the permit.
- Special Permit Duration: Issued for a maximum of 1 year or for a specific number of voyages, depending on the nature of the request.
- Special Permit: The Administration may allow exceptional practices for cases specified in the Regulation, considering economic necessities, testing, assembly, public interest, or foreign trade policies.
14.03.2025 Regulation Amendment: Approval by the General Directorate of Infrastructure Investments (AYGM)
- Scope: Layout plans for existing shore facilities without an approved implementation project, as well as facilities located in Special Environmental Protection Areas and Natural Protected Areas.
- Final Approval: For these specific areas, layout plans are subject to AYGM approval following the permits obtained from the Ministry of Environment, Urbanization and Climate Change (General Directorate for Protection of Natural Assets).
Amendments, Transfers, Audits, and Cancellations
Time management is vital for facility transfers and name changes:
- Change of Operator’s Trade Name: The Administration must be notified within 1 month of the change.
- Transfer or Lease of Shore Facility: The new operator must apply for an operation permit within 1 month of signing the transfer or lease agreement.
- Change of Facility Name and/or Address: In case of a name/address change, the permit is renewed under the same conditions without a site inspection. Such requests are not subject to İTDK review.
- Cancellation of Permit: Permits are cancelled by the Administration if the operator submits a written request, the right of usage expires, a court order for cancellation is issued, or the approved zoning plan for the entire facility is cancelled.
- Audit of Shore Facility: The Inspection, Determination, and Audit Commission (İTDK), the Administration, or the relevant Harbor Master may audit permitted facilities at any time. Permits may be suspended by the Administration in cases specified in the Regulation.
Administrative Monetary Fines
Fine amounts are increased annually based on the revaluation rate determined in accordance with the Tax Procedure Law No. 213. Article 19 of the Regulation lists the administrative fines to be imposed by the Harbor Master. If the same violation is repeated within the permit period, the fine is applied twofold (2x).
Key violations include:
- Non-compliance with Article 17/f.1(ı)
- Inadequacy of first aid units and equipment
- Failure to renew the operation permit on time
- Non-compliance with Article 17/f.1(c), (e), and (h)
- Non-compliance with Article 11/f.1 and Article 12/f.1
- Non-compliance with Article 5/f.2 of the Regulation
- Failure to notify changes in facility name, trade name, address, or facility transfer/lease
- Usage not compliant with the permit, unsuitability of the pier for calling vessels, and failure to meet Environmental Impact Assessment (EIA) requirements